All Projects
Colorow Senior Care Facility
Location: Olathe, CO
Owner: Colorow Health Care, LLC
Construction Costs: $3.5 Million
• Axia is providing full-service owners representative services on the addition and renovation of this senior care facility.
• The project consists of adding three "pods" consisting of approx eight residential rooms each at the ends of existing residential wings and renovating the center common area.
• Website: http://www.pinonmgt.com/fac_colorow.shtml
Academy Kids Dental and Ortho
Location: Colorado Springs, CO
Owner: Hero Dental
Size: 6,800 sf
• Axia performed the tenant build-out of this 6,800 sf pediatric dental and orthodontics office.
• The dental office consists of six exam rooms, a hygene area with six dental chairs, an ortho area with six dental chairs, two x-ray rooms and a mini-lab.
• Construction was completed in late 2009 and took 8 weeks and remained under budget.
Max Muscle - Lakewood
Location: Lakewood, CO
Owner: Franchise
Size: 1,200 sf
• Axia performed the tenant build-out of this retail space.
• Construction is scheduled to start by end of 2009 and complete in approximately two weeks.
Adventure Dental of Denver
Location: Denver, CO
Owner: Hero Dental
Size: 4,000 sf
• Axia performed the tenant build-out of this 4,000 pediatric dental office.
• The dental office consists of six exam rooms, a hygene area with five dental chairs, three x-ray rooms and a mini-lab.
• Construction was completed in under 7 weeks and remained under budget with no change orders.
Grace Pointe Senior Living Facility
Location: Greeley, CO
Owner: WGCC, LLC
Construction Costs: $12 Million
• Axia provided owner's representative services on the construction of this senior care facility.
• The development consists of three wings. One wing for skilled nursing and rehab, one wing for assisted living, and a third wing for memory care.
• The project consisted of 110 residential units, multiple kitchens, dining rooms, spas, salons, rehab gym, and offices totaling 72,000 sf.
• Website: http://www.gracepointegreeley.com/
Landmark Lofts
Location: Boulder, CO
Owner: Chanin Development
Construction Costs: $20 Million
• Axia is providing full-service owners representative services on the pre-construction and construction of this multi-family residential and retail mixed-use development.
• The development consists of four four-story residential buildings over two below grade parking garages with a 125 car capacity.
• At completion the residential buildings will consist of 103 units in over 115,000 sf. Amenities will include a fitness center, meeting and conference rooms, wireless internet access and a community room.
• The condos will range from 650 square-foot, one-bedroom units to two-story, three-bedroom units, totaling 1,800 sf.
• Retail includes a 1,000 sf coffee shop at street level.
• Construction began Summer 2007 and is anticipated to complete early 2009.
• Website: http://www.boulderlandmark.com
Arista Live/Work Lofts
Location: Broomfield, CO
Owner: Sunburst Design and New Design Logic
Construction Cost: $4 Million
• Axia is providing full-service owners representative services on the pre-construction and construction of this high-end multi-family live/work development.
• The development consists of 23 three-story units. Each unit is two-story living space over ground level commercial flex space and garage.
• At completion the units, including the flex space will average 2,500 sf.
• Construction was completed Summer 2008.
• website: http://www.aristalivework.com/
Lowry Steamplant Rowhomes
Location: Denver, CO
General Contractor: Buchanan Yonushewski Group
Owner: Jim Hartman & John Keith
Value: $3.5 Million
• Axia provided project management services to Buchanan Yonushewski Group on the construction of this high-end multi-family residential and live/work loft development.
• The development consists of 10 residential rowhomes. Six of the rowhomes consist of two-story residential over an unfinished basement and a detached garage. Four of the rowhomes are live/work units with two-story living space over ground level commercial flex space and attached garage.
• At completion the two-story units averaged 1,600 sf and the live/work units averaged 3,000 sf.
• Construction was completed in Winter 2006.
Pine Ridge Townhomes Remediation
Location: Basalt, CO
Owner: The Pine Ridge Townhomes Homeowners Association, Inc.
Construction Costs: $2.5 Million
• Axia is providing full Project Management, On-Site Supervision and Owners Representative services on the remediation of the foundation and drainage systems on a six building, 24 unit, townhome complex.
• The foundation repairs included stabilization from future settling and re-leveling of buildings that settled as much as 4" in places. This was accomplished with the use of compaction grouting techniques.
• Drainage work includes adding new storm sewer underdrain system, regrading, repaving and adding new drainage swales and curb and gutter.
• Remediation work was completed summer of 2008.
Lodo’s Bar & Grill Westminster
Location: Westminster, CO
Owner: Lodo’s Restaurant Group
Value: $3 Million
• Axia provided full-service owners representation on the pre-construction and construction of this stand alone restaurant in the Valle Vista retail development.
• The restaurant consists of 7,800 sf at the main level with a 4,400 sf rooftop patio and 2,650 sf unfinished basement.
• Construction completed in Summer of 2007.
Sherman Street Condos
Location: Denver, CO
Owner: Urban Development
Construction Cost: $1.5 Million
• Axia provided project management services on the construction of this existing apartment to for-sale condominium conversion project.
• The development consists of converting 27 existing apartment units into 24 for-sale condominiums.
• At completion the one-bedroom units will average 625 sf and two-bedroom units will average 900 sf.
• Construction was completed in Fall of 2007.
32nd & Zuni
Location: Denver, CO
Owner: Montano Development
Construction Cost: $4 Million
• Axia provided project management services on the pre-construction of this high-end multi-family project.
• The development consists of a 5-story building housing 8 high-end residential units with one-level underground parking.
• At completion the units will consist of six one-story flats and two two-story penthouses.
The Blacksmith Building
Location: Boulder, CO
Owner: The Blacksmith Building LLC
Construction Costs: $3.5 Million
• Axia managed the construction on the back-end of this mixed-use, multi-family residential, retail and parking garage project on Boulder's Pearl Street Mall.
• The project consists of seven high end condominiums, a ground level parking garage and ground level, core and shell retail.
• The project totals 10,551 square feet.
• Construction was completed in Spring 2006.
Terrace Condominium Remediation
Location: Glenwood Springs, CO
Owner: The Terrace Condominiums Homeowners Association, Inc.
Construction Costs: $7.5 Million
• Axia provided full Owners Representative services on the remediation of the foundation systems, roof truss systems, and drainage systems on a twelve building, 104 unit, condominium complex.
• The foundation repairs included stabilization from future settling and re-leveling of buildings that settled as much as 6" in places. This was accomplished with the use of compaction grouting techniques.
• Roof truss repairs included roof truss replacement in some areas and added bracing and bridging in other areas.
• Remediation work was completed in Summer 2006.
City Park Lofts
Location: Denver, CO
Owner: LCS Developers
Construction Costs: $4.5 Million
• Axia provided pre-construction Construction Management services on a two tower residential building with connecting link and two level, 12,400 square foot parking garage.
• At completion the two towers will house twenty 1-3 bedroom luxury loft units that range from 750 to over 1,500 sf and twelve 1-3 bedroom luxury townhomes that range from 1,000 to over 2,000 sf.
• Total area of all residential living space is 35,600 square feet.
The Landmark
Location: Greenwood Village, CO
Owner: Everest Development Co
Construction Costs: $80 Million
• Axia provided project management services on the pre-construction phase of this multi-family residential and retail, mixed-use, transit-oriented development.
• The development consists of two twelve story condo towers, seven retail structures and a parking garage.
• At completion Residential Tower One will consist of 122 units in over 200,000 sf and Tower Two will include 150 units in over 220,000 sf. Amenities will include a rooftop terrace and garden with infinity-edge water feature, a ground-level pool, a European day spa and a fitness center.
• The retail will total 160,000 sf and includes a six-screen theatre.
• The development is located within walking distance of the Orchard light-rail station between East Belleview Avenue and East Orchard Road on the west side of I-25.
Previous Project Experience
Belmar Blocks 3 & 4
Location: Lakewood, CO
Owner: Continuum Partners
Construction Costs: $13.1 Million
• Managed construction on four core and shell retail/office mixed-use buildings and associated site work.
• Totaled 217,000 square feet.
• Received temporary certificate of occupancy on all four buildings prior to the retail grand opening, despite a late start and fast track schedule.
• Coordinated construction with over a dozen other general contractors building out the interiors of the retail spaces during the core and shell construction.
The Beauvallon
Location: Denver, Colorado
Owner: BCN Development
Construction Costs: $49 Million
• Provided Project Management services on this luxury condominium complex consisting of a mixed-use condominium, retail, commercial office and structured parking project.
• Totaled 600,000 square feet configured in two residential towers.
• The development includes a 28,000 square foot fitness center, 8,500 square foot gourmet supermarket, restaurants, coffee shop, bakery, hair salon, dry cleaner, outdoor pool, oversized hot tub and 600 covered parking spaces.
Addition to the Operational Support Facility
Location: Schriever Air Force Base, Colorado Springs, CO
Owner: U.S. Army Corps of Engineers (USACE)
Construction Costs: $8 Million
• Managed construction of a three story office building addition to the existing occupied Operational Support Facility.
• Totaled 47,000 square feet.
• Received an Outstanding Performance Evaluation from the USACE for providing a quality project while working through numerous contract modifications, default of a major subcontractor, and major damage to the structure caused by 100 mph winds.
• Completed the project 3 months ahead of schedule and doubled the bid day fee.
• Utilized advanced Project Manager techniques, including cost and resource loaded scheduling for project control, production tracking and billing purposes.
ParkRidge Four
Location: Littleton, CO
Owner: Patrinely Group
Construction Costs: $12.7 Million
• Managed construction of one six story core and shell office building and below level parking for 72 vehicles.
• Totaled 200,000 square feet.
• Completed the project under budget and on schedule.
Avaya Research and Development Facilities
Location: Westminister, CO
Owner: Avaya
Construction Costs: $115 Million
Project Manager
• Provided project management services on this five building facility.
• Facility includes central atrium, conference and presentation building, two research and development wings and two precast parking garages.
• Totaled 450,000 square feet.
• Provided change order management services on this fast track project, which required designing the facility during construction causing over 50 modifications to the contract documents and approximately $20 mil worth of owner directed changes.
• Provided subcontractor buyout and coordination, and document control services.
Sun Microsystems Colorado Campus Phase I
Location: Broomfield, CO
Owner: Sun Microsystems
Construction Costs: $84 Million
• Provided project management services on this five building office campus.
• Totaled 563,000 square feet on 72 acres site.
• Campus houses open and closed offices, conference and training rooms, clean room facility, central plant, cafeteria, and fitness center.
• Provided change order management services including estimating, coordinating, and negotiating approximately $15M of owner directed changes.
Courtyard by Marriott Hotel
Location: Denver, CO
Owner: L.C. Fullenwider
Construction Costs: $8.9 Million
• Managed construction of this 202 room eight story post tensioned hotel near Denver International Airport.
• Hotel features a swimming pool, conference center, restaurant and bar.
• Completed the project ahead of schedule and under budget.